ITER : testing of overhead cranes started

Since the giant poster was added to the Assembly Hall’s completed exterior in June 2016 the building has looked from afar like a finished project. But inside, teams have been advancing on finishing works—installing plasterboard, lighting, fire protection, cable trays; jointing and painting; and creating stairwells and a lift. Most recently, a first coat of varnish was applied to the floor to limit dust, testing of the overhead cranes started, and a special zone was prepared for the building’s first and most impressive assembly tools, the twin vacuum vessel sector sub-assembly tools. European contractors successfully achieved an ITER Council milestone in late June by making one part of the Assembly Hall « ready for equipment. »

http://www.iter.org/newsline/-/2777

Rejoignez un groupe dynamique !
nous sommes en permanence à la recherche de nouveaux talents !
Reel recrute partout dans le monde

semaine des métiers du nucléaire 2024

Vous souhaitez vous informer, échanger sur nos métiers, trouver un emploi dans le domaine, rencontrer nos équipes

Rejoignez l’aventure REEL 2024

En 2024 plus que jamais, les 2700 femmes et hommes de REEL sont aux côtés de leurs clients et partenaires pour concevoir

Retrouvez REEL et CNIM Systèmes Industriels sur WNE

L’édition 2023 de World Nuclear Exhibition se tiendra à Paris-Nord Villepinte du 28 au 30 novembre. WNE est un événement

Rencontrez les équipes REEL au salon Wind for Goods

Join REEL at Wind for Goods: Discover innovative solutions for eco-friendly maritime transport at this 2nd edition event